MIL-DTL-62030E(AT)
5. PACKAGING
5.1 Packaging. For acquisition purposes, the packaging requirements shall be as
specified in the contract or order (see 6.2). When actual packaging of materiel is to be performed
by DoD personnel, these personnel need to contact the responsible packaging activity to ascertain
requisite packaging requirements. Packaging requirements are maintained by the Inventory
Control Point's packaging activity within the Military Department or Defense Agency, or within
the Military Department's System Command. Packaging data retrieval is available from the
managing Military Department's or Defense Agency's automated packaging files, CD-ROM
products, or by contacting the responsible packaging activity.
6. NOTES
(This section contains information of a general or explanatory nature which may be
helpful, but is not mandatory.)
6.1 Intended use. The transmission covered by this specification is intended for
production use, as spares, or as replacements in military combat and tactical vehicles. The
transmission is military unique because of the extreme environmental conditions encountered.
Commercial components are not designed to withstand such extreme environmental conditions
and would experience failure.
6.2 Acquisition requirements. Acquisition documents must specify the following:
a. Title, number, and date of this specification.
b. Issue of DoDISS to be cited in the solicitation, and if required, the specific issue of
individual documents referenced (see 2.2.1).
c. If a first article sample is required (see 3.1).
d. Oil filler, if required (see 3.3).
e. When first article inspection is required (see 4.2).
f. Packaging requirements (see 5.1).
6.3 First article. When requiring a first article inspection, contracting documents should
provide specific guidance to offerors. This guidance should cover whether the first article is a
first article sample, a first production item, or the number of test items. These documents should
also include specific instructions regarding arrangements for examinations, approval of first article
test results, and disposition of first articles. Pre-solicitation documents should provide
Government waiver rights for samples for first article inspection to bidders offering a previously
acquired or tested product. Bidders offering such products who wish to rely on such production
testing must furnish evidence with the bid that prior Government approval is appropriate for the
pending contract.
13
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business